[Rapid Start-up of Simultaneous Nitrification and Denitrification Coupled Phosphorus Removal Process and Its Performing Characteristics].
Journal:
Huan jing ke xue= Huanjing kexue
PMID:
26911007
Abstract
In this study, simultaneous nitrification and denitrification (SND) coupled Phosphorus removal process through gradually decreasing DO concentration was investigated by treating wastewater with a low COD/TN ratio (C/N = 3 : 1-4: 1) in a sequencing batch reactor (SBR) inoculated with aerobic granular sludge (AGS). Successful SND coupled Phosphorus phenomenon occurred after 20d at the DO concentration of 0.50-1.0 mg x L(-1). In the following 40 days, the average removal rates of COD, NH4(+) -N, TN and TP were 84.84% , 93.51%, 77.06% and 85.69%, and the NO3(-) -N and NO2(-) -N average accumulations in the effluent were only 4.01 mg x L(-1) and 3.17 mg x L(-1), respectively. The AGS had complete forms and good settling performances, and the sludge volume index (SVI) was about 55.22 mL x g(-1) at the end of starting-up stage. The results of different nitrogen sources showed that the removal rate of TN was in the order of NH4(+) -N > NO2(-) -N > NO3(-) -N, and the removal rate of TP was in the order of NO3(-) -N > NO2(-) -N > NH4(+) -N. The nitrogen and phosphorus removal of wastewater were mainly realized by simultaneous nitrification and denitrification and denitrifying phosphorus removal, respectively.